Hello, welcome to this second post of my blog about my year in Globalia. We worked hard doing repairs on the hydraulic system of the Turbocommander.
Specifically, we removed, tested and installed the Hydraulic Shut Off Valve of Turbocommander number 1 engine. This type of valve is basically responsible for cutting off the supply in case of emergency or that is not necessary for the engine. In this practice, I climbed on top of the wing to remove the valve and Dani helped me with the tools to use. We wrote the written part together reviewing aircraft maintenance manuals.
After finishing the practice of the Hydraulic Shut Off Valve, we started working with the auxiliary hydraulic pump. We had to uninstall and do some tests to check if it is serviceable. And finally, we installed the pump so that the next group could do the practice as soon as possible. Dani and I did the written part, while the other two members of the group, Carlos and Jesús, did the removal and installation part.
And finally, I would like to add that I am part of the technical staff of a football team, the juvenile team B of A.D. Son Sardina. This weekend, we won against Poblense 2-1 in a tight game but playing at home we could not lose.
Thank you very much for your attention and see you soon.